Almodôvar invests in video surveillance to reinforce forest protectionPhoto by Sofía Marquet on Pexels
BusinessBeja

Almodôvar invests in video surveillance to reinforce forest protection

Alentrium30 August 2026 at 12:37

The Municipal Council of Almodôvar will invest up to 138,126 euros, excluding VAT, in the acquisition and installation of two forest video surveillance systems in Alto do Mú and Moinho da Boavista. The public tender for this investment was launched by the municipality and published through Announcement No. 21872/2026 in the Official Gazette on August 28.

The procedure includes the acquisition and installation of the two systems under a single contract, with an execution period of 278 days. The award criterion chosen by the Municipality of Almodôvar is exclusively price. Interested companies may submit proposals until 5:00 PM on September 2, 2026.

The investment will be made without recourse to European Union funds. After the analysis of proposals and the award, the selected entity will have the 278 days established in the contract to complete the acquisition and installation of the equipment.

The municipality of Almodôvar is located in the district of Beja and intends to reinforce the technological means for the observation and protection of the forest territory with the installation of these video surveillance systems.

Câmara Municipal lançou concurso para instalar dois sistemas no Alto do Mú e no Moinho da Boavista. Contrato tem um prazo de execução de 278 dias e as propostas podem ser apresentadas até 2 de setembro.

A Câmara Municipal de Almodôvar vai investir até 138.126 euros, sem IVA, na aquisição e instalação de dois sistemas de videovigilância florestal em diferentes pontos do concelho, reforçando os meios tecnológicos destinados à observação do território.

Os equipamentos serão instalados no Alto do Mú e no Moinho da Boavista, de acordo com o concurso público lançado pelo município e divulgado através do Anúncio n.º 21872/2026, publicado em Diário da República a 28 de agosto.

Dois sistemas num único contrato

O procedimento contempla a aquisição e instalação dos dois sistemas de videovigilância num único contrato, não estando prevista a divisão em lotes.

preço base foi fixado em 138.126 euros, sem IVA, valor que estabelece o limite máximo definido pela autarquia para esta contratação e que não corresponde necessariamente ao montante pelo qual o contrato será adjudicado.

Segundo o anúncio do concurso, o critério de adjudicação escolhido pelo Município de Almodôvar é exclusivamente o preço.

O contrato terá um prazo de execução de 278 dias, período durante o qual a empresa selecionada deverá assegurar o fornecimento e a instalação dos equipamentos previstos para os dois locais.

Concurso não tem financiamento europeu

O investimento será realizado sem recurso a fundos da União Europeia, segundo a informação constante do procedimento.

A instalação dos sistemas no Alto do Mú e no Moinho da Boavista permitirá acrescentar meios tecnológicos à vigilância florestal no território de Almodôvar, concelho situado no distrito de Beja.

As empresas interessadas no concurso têm até às 17h00 de 2 de setembro de 2026 para apresentar as respetivas propostas através da plataforma eletrónica indicada no procedimento.

Depois da análise das propostas e da adjudicação, a entidade selecionada terá os 278 dias estabelecidos no contrato para concretizar a aquisição e instalação dos dois sistemas de videovigilância florestal.

O conteúdo Almodôvar investe em videovigilância para reforçar proteção florestal aparece primeiro em Alentrium.

Related articles

Business

Soure invests 575 thousand euros in cleaning the Arunca river

The Municipal Council is investing 575 thousand euros in the cleaning and clearing of the Arunca river, after the damage caused by storm Kristin. The work includes cleaning the riverbed and banks, with the aim of reducing the risk of future flooding in the region.

Diário de Coimbra30/08/26, 13:45
Business

Fuel prices – Week of August 31 to September 6, 2026

During the week of August 31 to September 6, 2026, an increase of approximately 1.5 cents per liter in gasoline prices and a decrease of approximately 7.5 cents per liter in diesel prices are expected in Portugal. The average price of diesel, which was at 2.071 euros per liter on the previous Friday, is expected to drop to 1.996 euros, while gasoline will rise from 1.989 to 2.004 euros per liter. Variations may differ between fuel stations due to sector liberalization. The changes are attributed to the conflict in the Middle East, involving the USA, Israel and Iran, which led to the blockade of the Strait of Hormuz, through which approximately 20% of world oil and natural gas trade passes, causing fluctuations in fuel prices in Europe.

Jornal de Mafra30/08/26, 13:17
Seis de cada diez coches de segunda mano vendidos en España superan los 15 años de antigüedad
Business

Six out of ten second-hand cars sold in Spain are over 15 years old

A study by CARFAX based on almost five million vehicles of the best-selling models in Spain revealed that 61% of transferred used cars are over 15 years old, which is ten percentage points above the national vehicle fleet average, set at 51%. The used vehicle market in Spain stands out for the high age of its offer.

El Periódico Mediterráneo - General30/08/26, 13:01
Business

Hotels in Rio fear losing Rock in Rio reservations to short-term platforms

Hotels in Rio de Janeiro are worried about losing reservations for Rock in Rio to short-term accommodation platforms. Alfredo Lopes, president of HotéisRIO, complains about the lack of equality between hotels and these platforms, highlighting that hotels pay ISS, commercial IPTU fees and water tariffs, generate formal jobs and follow strict guest control and security rules, while platforms would not have the same obligations.

oglobo30/08/26, 13:00