The Municipal Water and Sanitation Services of Mafra inform about a planned interruption of the water supply in the municipality. The interruption is scheduled for September 16th, 2026, between 09:00 and 12:00.
The intervention affects the parish of Ericeira, more specifically the locality of Fonte Boa dos Nabos. The streets directly affected are Praceta Almorzinho and Rua João Lucas.
The reason for the water supply interruption is related to interventions in the supply network. The SMAS of Mafra committed to carrying out the work as quickly as possible, in order to minimize the inconvenience caused to the local population during this period.




