Metrobus arrives at Coimbra-B and Praça da República amid doubts and changes in BaixaPhoto by Pexels on Pexels
Business
Транспорт
Coimbra

Metrobus arrives at Coimbra-B and Praça da República amid doubts and changes in Baixa

Campeão das Províncias10 September 2026 at 14:21

Metrobus expanded on the 10th to Coimbra-B and Praça da República, in a new operational phase that altered traffic in Coimbra's Baixa and affected more than 20 lines of the Municipal Urban Transport Services of Coimbra. This reorganization covered approximately 14% of daily passengers and sought to avoid overlap between the SMTUC network and Metrobus, with Arnado, Praça da República and the Estádio/Solum area serving as connection points between the two services. A new stop restricted to public transport and local access was created on Avenida D. Sesnando Davides.

Rua da Sofia now has reserved circulation for public transport and local access, with the roadway narrowed and delimited by planters. Part of the freed space is being used for the installation of terraces. On Rua de Saragoça, which now operates only in the downward direction between Rua Guerra Junqueiro and Rua Montarroio, morning queues were recorded extending to Rua de Aveiro, indicated by the municipality as one of the main alternatives for those arriving from Casa do Sal towards Praça da República.

Reactions to the change were divided. Aguinalda Amaro, owner of Café Sofia, considered that the silence now provided is "worth its weight in gold" and expressed herself convinced by the change. A worker at another establishment admitted that the new configuration may benefit commerce on Rua da Sofia, but fears problems on surrounding streets. Maria Augusta, a florist, classified the change as negative and criticized the lack of clarification about loading and unloading. Miguel Braga, a trader on the street, considered that the removal of traffic may harm part of the trade and worsen circulation on nearby arteries.

Passengers also expressed doubts and concerns. Maria Fernanda, a daily user, feared she would not arrive at work on time after having hitched a ride from a colleague the day before. Fernanda Sousa, 65 years old, criticized the absence of buses between Arnado and the Market and admitted that the changes may drive passengers away from municipal transport. Sílvia Miranda, who was waiting for line 19, described the morning as confusing, although she admitted giving the new model the benefit of the doubt. Given the scale of the changes, Coimbra City Hall launched an information campaign at www.cm-coimbra.pt/comovou and recommended the use of navigation applications during the adaptation to the new traffic scheme.

Related articles

Business

Volta collected 305 million packages in five months

The Volta system collected 305 million single-use beverage packages, with capacity up to three liters, during the first five months of operation. The president of the system manager highlighted the large-scale uptake, with nearly five million packages being returned daily, demonstrating the success of the packaging collection initiative.

Observador10/09/26, 15:26
Business

Will there be more interest rate hikes in the near future?

Edgar Caetano argues that the ECB's message opens the door to new interest rate hikes, since inflation is expected to remain high for some time, conditioned by the conflict in the Middle East, raising the question about the future of interest rates in the euro area.

Observador10/09/26, 15:25
Subida das taxas de juro: quais as consequências para as famílias portuguesas?
Business

Rise in interest rates: what are the consequences for Portuguese families?

The European Central Bank raised interest rates again in a context of inflation aggravated by the Middle East conflict, with a direct impact on Portuguese families, especially on mortgage payments. Analyst Catarina Castro explains the consequences of this decision for family budgets and points out alternatives to mitigate the effects.

SIC Notícias10/09/26, 15:25
Business

Goodbye walks: a funicular will be inaugurated on this date that will give you a 'lift' to this beach without having to walk kilometers on foot

The Pederneira Funicular, in Nazaré, should open in January 2027, creating a public transport connection between the upper area and the beach. With about 200 meters in length and an investment of 10 million euros fully funded by the Recovery and Resilience Plan, the equipment will have the capacity to transport up to 300 people per hour in each direction, with capacity for 40 passengers per trip. The works are practically completed, but tests and certifications need to be completed by the end of the year. The project includes accessibility for people with reduced mobility and bicycle transport, aiming to reduce automobile dependence and greenhouse gas emissions. The four-story building will have glass openings and lighting that will evoke the image of a lighthouse at night.

Postal do Algarve10/09/26, 15:20