Circulation on the Beira Baixa Line will resume on September 20, with the reopening of the section between Mouriscas-A and Ródão. This section had remained closed due to damage caused by Storm Kristin.
Infraestruturas de Portugal (IP) announced that 3.4 million euros had been invested in the repair and reconstruction works of the damaged section. This reopening will allow CP – Comboios de Portugal to restore railway services along the entire line.




