ANVISA suspends manufacturing of cleaning products at Unilever unit in SP due to irregularitiesPhoto by Felipe Silva on Pexels
BusinessSetúbal

ANVISA suspends manufacturing of cleaning products at Unilever unit in SP due to irregularities

cbn2 September 2026 at 17:28

The National Health Surveillance Agency (ANVISA) suspended on Wednesday (2) the manufacturing of cleaning products at the Unilever unit in Vinhedo, in the interior of São Paulo. The suspension occurred after an inspection that identified failures in compliance with good manufacturing practices standards at the unit. The measure was published on the same day and applies only to manufacturing, not including the recall of products that are already on the market.

The inspection was carried out between August 24 and 28, in conjunction with the São Paulo State Health Surveillance Center and the Vinhedo Municipal Health Surveillance Department. The agency reported that it found irregularities related to the requirements for the manufacturing of sanitizing products, but did not detail which specific problems were identified during the inspection.

Unilever stated in a note that the inspection pointed to the need for adjustments in documentation and quality control processes, but did not provide further details about the corrections that will be made to reverse the suspension.

Related articles

Business

Four machines ready for work: Opel shows the news

Opel presented four commercial machines ready for work, aimed at professionals who need to transport workers and materials, load goods or make urban deliveries. The news aims to meet the demands of the commercial sector with vehicles suitable for different work needs.

Notícias de Coimbra02/09/26, 18:29
Business

There are at least 2000 water intakes to regularize. Many requests were lost in the system

In Portugal, there are at least two thousand water catchments, between boreholes, ponds and wells, that need to be regularized, a number that may exceed four thousand according to a survey by Anpromis. Many requests were likely lost in the system, which worsens the situation.

Público02/09/26, 18:23
Investimentos do PRR sob alçada do Ministério do Trabalho integralmente cumpridos
Business

PRR investments under the Ministry of Labour fully fulfilled

The Ministry of Labour achieved full execution of the investments planned under the Recovery and Resilience Plan (PRR), totaling 1.4 billion euros, demonstrating compliance with the targets established for this government area within the economic recovery program.

Correio da Manhã02/09/26, 18:22
Do petróleo à eletricidade: como pode o conflito no Irão aumentar os preços?
Business

From oil to electricity: how can the conflict in Iran increase prices?

Oil has been rising for three consecutive days, natural gas reached its highest value since January 2023, and electricity is more expensive in the Iberian market. This episode of the "Economia dia a dia" podcast from Expresso explores the reasons behind this simultaneous rise in the three energy markets, questioning how the conflict in Iran may be contributing to the price increases.

Expresso02/09/26, 18:20