All news
Politics
Business
Technology
Incidents
Sports
Weather
Science
Entertainment
World
Real Estate
AI News
Bentley prepares its first electric: what is already known about the new Torcal
Business
Investments

Bentley prepares its first electric: what is already known about the new Torcal

SAPO Notícias13 September 2026 at 12:00

Bentley is preparing its first electric vehicle, called Torcal, a new SUV that represents a milestone in the history of the British luxury brand. The model will be unveiled in the coming weeks and the first customers should receive it in the first quarter of 2027.

The Torcal will be Bentley's fourth product line, joining the Continental, Flying Spur and Bentayga models in the manufacturer's lineup. This expansion marks the brand's entry into the fully electric vehicle segment.

The known information about the new model is still limited, but it is known that the development of this electric vehicle is aligned with Bentley's electrification strategy, which aims to transform the company into a fully electric brand in the future.

Why this matters

Readers interested in the automotive sector and luxury brands are closely following this transition of Bentley towards electric mobility, which reflects a broader trend in the European automotive industry. The Torcal represents a significant investment by the British brand and may define Bentley's future positioning in the premium electric vehicle market.

About this summary

This is our short summary of a report published by SAPO Notícias on 13 September 2026 at 12:00; the full text stays with the publisher. In our feed it sits under Business. We currently carry 22154 items in that section.

All items in this section →
Source

Related articles

PSP investe 416 mil euros em obras na esquadra de Câmara de Lobos
Business

PSP invests 416 thousand euros in works at the Câmara de Lobos police station

The PSP awarded a contract for 416,300 euros, without VAT, for the rehabilitation of the facades and roofs of the Câmara de Lobos Police Division, in the Regional Command of Madeira. The work was awarded to the company Etermar – Engenharia, following a public tender launched in June, with a base price of 450 thousand euros. The contract was signed on August 26 and published in early September.

dnoticias.pt13/09/26, 17:41
Menos brindes à vista. Seca e calor extremo reduzem produção de champanhe para metade
Business

Less toasts in sight. Drought and extreme heat reduce champagne production by half

Champagne production in France is expected to fall to 1.34 million hectoliters, a 48% reduction compared to the previous year, according to the French Ministry of Agriculture. The drought and extreme heat that ravaged French vineyards resulted in one of the smallest harvests in the last 30 years.

Jornal de Negócios13/09/26, 17:00
Business

VILA FLOR MUNICIPAL PAVILION RECEIVES 75 THOUSAND EURO INVESTMENT TO IMPROVE ENERGY EFFICIENCY

The Vila Flor Municipal Pavilion is receiving a 75 thousand euro investment to improve energy efficiency and user comfort. The project includes the installation of 34 photovoltaic panels on the roof, three high-efficiency heat pumps and a thermal tank, enabling energy production from renewable sources. The intervention should reduce the sports facility's energy consumption by more than 30%, with a direct impact on operating costs and carbon emissions. This renovation is part of a broader strategy to modernise municipal infrastructure, combining better conditions for sports practice with environmentally sustainable solutions.

Canal N – Notícias – Trás-os-Montes e Alto Douro13/09/26, 16:55
Business

Old tenants returned keys that didn't open the door and the house ended up occupied by 'squatters': court didn't rule in favor of the owner

A Spanish owner tried to hold former tenants responsible for unpaid rent after the house was illegally occupied. He claimed that the returned keys didn't open the door, but the court considered that the delivery of the keys constituted a sufficient act of restitution of possession, rejecting both the eviction request and the collection of rent. The Provincial Court of Barcelona confirmed that, at the time of the legal action, the contract was already terminated and the tenants had already returned the property, with no evidence of any connection between the former tenants and the illegal occupants.

Postal do Algarve13/09/26, 16:40