Circulation on the Beira Baixa Line will resume on September 20. The reopening follows an investment of 3.4 million euros.
The section that was closed is located between Mouriscas-A and Ródão. This section of the railway line suffered damage caused by storm Kristin.
Infraestruturas de Portugal announced today the reopening date of the line and the value of the investment made in the repair works.




