Carris to launch international public tender for reconstruction of Ascensor da Glória in 2027Photo by Angel Rondon on Pexels
Business

Carris to launch international public tender for reconstruction of Ascensor da Glória in 2027

Eco31 August 2026 at 18:39

Carris will launch in the first quarter of 2027 an international public tender for the reconstruction of the Ascensor da Glória, in Lisbon. The announcement was made by the company's CEO, Rui Lopo, during a press conference at the Ordem dos Engenheiros, almost a year after the September 3, 2025 accident that killed 16 people. The inauguration of the new elevator is scheduled for 2029.

Rui Lopo highlighted that this is a new installation and not a reconstruction, emphasizing that the new equipment must be absolutely safe, while simultaneously respecting the identity and history of the site. Architect Ricardo Bak Gordon has been invited to join the working team on the specifications document, which will also include the requalification of Calçada da Glória, which runs from São Pedro de Alcântara street to Restauradores. The Ascensor da Glória area is a national monument.

Gonçalo Reis, vice-president of the Lisbon city council, added that they want a robust solution that follows the best global safety practices, that revitalizes public space, and that respects the personality of the elevator. Architect Bak Gordon intends to rehabilitate the Chafariz da Glória, from 1754, and the historic lighting, having highlighted that major accidents are opportunities to look to the future.

Neither the city council vice-president nor the Carris CEO disclosed project figures. The GPIAAF final report on the accident will not be completed in September, as planned, and is expected to be published by the end of the first quarter of 2027. Insurance company Fidelidade revealed it has assumed the reimbursement of approximately 2.3 million euros in expenses related to the accident, having already concluded compensation agreements with four families and with seven cases currently under negotiation. Carris also stated that it has terminated all contracts with MNTC, the company responsible for maintaining the elevator when the accident occurred.

Related articles

Business

Students: You only have a few hours left to request the Book Voucher

Students and young residents in Portugal have until midnight today, August 31, to apply for the Book Voucher on the Sou Leitor platform, a government program that provides a 30-euro voucher for the purchase of literary works. Young people born between 2007 and 2008 can apply, and they need electronic authentication through the Digital Mobile Key or Citizen's Card. This edition has already issued more than 50,000 vouchers, surpassing the total from the launch year. The balance does not provide change or accumulate, and is non-transferable, excluding textbooks and periodic publications. Independent booksellers highlight the positive impact on sales and attracting new readers to physical stores, with an effective usage rate above 70% in the summer. The General Directorate of Books is now preparing the project evaluation to support future budget allocations.

oRegiões31/08/26, 19:15
Business

New line reinforces public transport during school period

The Intermunicipal Community of Alto Tâmega e Barroso, through the municipality of Vila Pouca de Aguiar, has put into operation a new public transport line, MU053, operated by Flaviamobil. The route connects Trandeiras to Vila Pouca de Aguiar, passing through Afonsim, Reguengo and Cabanes, with departures from Trandeiras at 7:30 am and from the municipal seat at 6 pm, Monday to Friday. The line will operate exclusively during the school period, complementing public transport in the Alvão area, and results from a concession awarded to Flaviamobil that came into effect in January 2024.

A Voz de Trás-os-Montes31/08/26, 19:07
Encuesta: ¿Has notado la subida de precios con la vuelta a la rutina?
Business

Survey: Have You Noticed the Price Increase with the Return to Routine?

September marks the return to routine and is one of the times of the year when family budgets suffer the most. To the usual expenses are added the costs of back-to-school, supermarket, fuel and gym, while households also face rising energy and fuel prices.

El Periódico Mediterráneo - General31/08/26, 18:54
Business

Sunotec advances with Germany's largest battery storage project in Stendal

Sunotec is building a 100 MW / 441 MWh battery energy storage system (BESS) in Stendal, Saxony-Anhalt, which will be among the largest in Germany when completed in the first quarter of 2027. The project reached "ready to build" status in the second quarter of 2026 and is being implemented as a "turnkey" solution, integrating engineering, installation, and long-term operation and maintenance. This initiative represents a milestone in Sunotec's European expansion, with the company having already installed 6.1 GWh of BESS capacity across the continent. The system is designed to store electricity during periods of high supply and release it when needed, providing flexibility to the electrical grid and supporting renewable energy integration. The project is part of the SECURSUN joint venture between Sunotec and securenergy.

Jornal Económico31/08/26, 18:53