A new funicular will link Nazaré to Pederneira, with the opening expected in January. The infrastructure will have the capacity to transport 40 passengers on each trip, allowing the movement of up to 300 people per hour, in each direction.
The funicular will connect Nazaré beach and Pederneira, facilitating access between these two areas. The system was designed to meet the transport demand between these two points in the town.
The infrastructure comes to address the mobility needs in the region, offering a transport alternative for residents and visitors who wish to travel between the coastal area and the higher area of Pederneira.




